KBI 310301 Job Scheduling During Power Shutdown
Version
All
Date
12 Mar 2012
Summary
What happens to the jobs scheduled when a power shutdown occurs for a Job Scheduler server?
Technical Background
Suppose there is a power shutdown for Argent Job Scheduler server from 8 a.m. to 11 a.m. and there are jobs scheduled to run during this time period.
There are also jobs scheduled to run after 11 a.m. Should these jobs be reconfigured?
Argent Job Scheduler will automatically run the jobs that were scheduled during the outage time (8 a.m. to 11 a.m) whenever the server is back in action.
Jobs scheduled to run after 11 a.m. will also run as per schedule even if other jobs are running.
There is no need to re-schedule any jobs.
Resolution
N/A