A Relator can use dynamic scheduling and option ‘Re-check Every x Minutes’
When A Rule is broken the first time, an Event is fired as expected
The Supervising Engine starts running a re-check every x minutes as specified in the Relator setting
When Argent AT runs recheck, it does not fire Event if Rule is still broken
A coding error in dynamic scheduling causes recheck is executed at the spot that a normal Relator execution is scheduled
As results, Supervising Engine might not fire new events for the same condition until recheck stops when the condition is corrected or maximum re-check time has been reached
The issue persists even the original Event is answered or purged
The issue does not happen for Relator using scheduling with fixed start time or do recheck using normal Relator check mechanism
The issue has been addressed in 3.1A-1501-A or later
Technical Background
After the first event is fired for the Relator, Supervising Engine will run recheck on the broken Rule every one or a few minutes as specified in the Relator
For the recheck, no event should be fired when Rule is found broken
The initial Event has already notified customer the condition
The recheck is mixed with the regular Relator execution
For example, a Relator is scheduled to run once every 10 minutes
When a Rule is broken, the Relator should do recheck every 1 minute
After the Rule is broken for the first time, Supervising Engine should run 9 rechecks then 1 normal execution and repeat the pattern every 10 minutes
If the Relator is dynamically scheduled, in Argent AT 3.1A-1410-A or earlier, Supervising Engine will run 10 rechecks every 10 minutes instead
The normal execution is wrongly replaced with recheck
As results, no new event will fire even the original event is answered or purged
The issue does not always happen even for dynamic scheduling
It happens if the Relator interval is multiple times of recheck interval
For example, if Relator interval is 60 minutes, the issue will happen if recheck interval is 30 minutes, but the issue will not happen if recheck interval is 7 minutes
The issue can be also ‘resolved’ if the condition is corrected then Rule is broken again
When the condition is corrected, the recheck will stop
When the Rule is broken again, Relator is executed normally, not a recheck
As results, a new Event will be fired
Most customers set up recheck for automatic resolving events
Customer does not expect new Event if condition persists
That’s probably why the issue has not been reported until recently
Resolution
Upgrade to Argent AT 3.1A-1501-A or later
For customer who cannot upgrade immediately, he can reconfigure the Relator to use option ‘Use Normal Relator Check Mechanism’, or use fixed start time in Relator scheduling